RECENT PROJECTS

Screenshot 2021-05-26 085129.jpg

Delaware Basin Optimization

Client was unhappy with their Delaware Basin learning curve, achieving a 14% reduction in drilling time after 2 years. JGL Consulting's Bit and BHA Specialists reviewed 2 years of bit runs, engaged vendors, and developed evergreen plans.

​

Through standardized BHAs, refinement of bit selection, and optimized parameters each well now requires 2.4 fewer BHAs.

​

Every hole section record has been beat, most multiple times.

​

Wolfcamp Drilling Days Reduced 40% in 10 months.

Average well now 10 days.

​

Bone Springs Days Reduced 28% in 10 months.

Average well now 10 days.

​

With JGL Consulting Operator shaved off days roughly 6 times faster than they could do on their own.

​

Current savings is $2.5 Million/month. The drilling efficiency gains allowed the operator to release 2 rigs and still deliver the same number of wells every month.

​

4.jpg

Directional Assistance

Client engaged JGL Consulting to fix their directional issues, specifically: assess providers, analyze problems, review local market, and recommend steps forward.

​

Reviewed 27 rental and full-package directional vendors.

Provided concise report on services offered, tool features, strengths, weaknesses, and ranked likelihood to improve performance. Operator made decisions based on informed, bias-free report.

​

Reduced Motor Failures by 52% and MWD by 55%.

Vendors eager to improve performance gained market​ share. Provided alternates for vendors who were not on-board with drilling program improvements.

​

Client program moving forward with increased confidence to push drilling parameters and ROP, knowing they have most competent tools and people for drilling at red-line.

​

Annotation 2020-07-20 072433.jpg

Industrial Health

As the world struggled with the COVID-19 pandemic, Operators wanted to prevent rampant illness on their sites.

​

JLG Consulting engaged clinical experts, studied CDC Research, and tailored plans to each Operator and site. Perform service for roughly 100 wells a year.

​

JGL's field savvy personnel took active steps to reduce each Operator's pandemic exposure and served as onsite knowledge resource. Besides preventing multiple COVID exposed persons on location, JGL personnel served as first responders to 3 different fires, prevented oil-based mud spills on Federal Property, smoothed over unhappy landowners, and coordinated traffic to prevent delivery bottlenecks of casing and frac sand to location.
 

AV-Cogs.png

Investigations

Operator became stuck at TD of a horizontal exploration well, causing loss of directional tools, side-track, and re-drill. With conflicting stories and finger-pointing from all sides, Operator asked JGL Consulting to investigate and provide learnings as a repeat incident was simply not acceptable.

​

JGL Consultant performed an investigation, examined all records, and investigated probable causes. Consultant was able to rule out the prevailing theory and discovered an unsuspected, geologic root cause. Recommendations were made and consultant stayed onsite for he re-drill monitoring for signs of any issue.

​

The re-drill was trouble free through planned TD, so TD was extended. In the extended lateral Consultant noted the first signs of issue. Chain of Command was notified and TD was called. Casing was run to extended TD and cemented. The presence of an unstable formation stringer was confirmed from logs, collected formation samples, and correlation of geo-steering reports.

​

Client credits JGL Consulting with preventing the expense and embarrassment of a second stuck pipe incident, saving $1.2 Million.

​

​

​

​